NTM – Survey Vessel May 2022

Rampion NTM 02.05.2022 and 23.05.2022

Work Scope
Ocean Ecology Limited have been contracted by RWE to undertake seabed camera surveys within and around the Rampion Offshore Wind Farm array and export cable route. The surveys will involve deployment of a drop down camera system at 14 locations during which time the vessel will be restricted in her ability to manoeuvre.

Area of work
All DDV camera work lies within the footprint of the Rampion windfarm array and export cable corridor.
Seren Las to operate to/from Brighton marina.

Survey Timeframe and Duration
Survey duration will be 1-2 days and will undertake between the 2nd and 23rd May dependent on mobilisation and weather.